A direct-to-consumer furniture retailer with 99+ stores faced persistent time gaps between product delivery and installation — a failure point that directly drove customer complaints and cancellations in a category where the last interaction defines the brand.
Results
- 45% reduction in delivery-to-installation time gap
- 31% increase in vehicle load capacity utilisation
- 14% reduction in per-delivery vehicle costs
- Faster, automated rider payout processing